02 / PROJECT ASSURANCE
Inspect the details.
Verify the complete order.
Quality control should connect the physical machine to the approved specification. A generic checklist is not enough when mast, battery, attachments, tyres and destination requirements differ.

Inspection scope depends on the selected model and agreement. This page describes review points to confirm with the quotation; it does not claim an unlisted certification or guarantee.
01 / WORKFLOW
Six connected stages.
One defined handover.
Agree the relevant evidence, responsibility and acceptance point for the actual order.
Specification match
Check the model, identification, rated-capacity basis and every approved configuration line.
Visible inspection
Review structure, mast, chains, hoses, forks, wheels, guards, connectors, finish and accessible components.
Operating functions
Agree checks for travel, steering, braking, lifting, lowering, controls, lights and attachment functions.
Power-system review
Confirm the ordered battery, charger, connector, engine or fuel-system direction and destination requirements.
Documentation check
Count manuals, labels, keys, tools, spares and requested commercial or technical documents.
Exception closure
Record differences, corrective actions, responsibility and acceptance before release or shipment.
02 / CONTROL POINTS
Make every handoff
easy to verify.
These control points keep the machine, documents and agreed service scope connected.
Incoming scope
Approved technical and commercial revision
In-process checks
Configuration and accessible assembly points
Final functions
Agreed operating and option checks
Recorded release
Evidence, exceptions and acceptance status
03 / PROCESS IN CONTEXT



Illustrative ZJ brand scenes. They explain process stages and do not represent verified customer sites, named facilities or completed deliveries.
04 / PREPARE THE REQUEST
Send the right
project details.
A complete first message reduces assumptions and helps identify the correct technical or commercial next step.
Prepare this request- Final quotation or specification
- Models and serial identification needs
- Configuration and option list
- Inspection points and tolerances
- Photo, video or third-party requirements
- Document and spare-parts list
05 / PRACTICAL ANSWERS
Confirm before
you commit.
Is quality control the same for every forklift?
No. The checklist should reflect the exact model, mast, power system, tyres, attachments, options and destination.
Can I request a third-party inspection?
Include the required agency, timing, scope and reporting format in the enquiry so feasibility and responsibility can be discussed.
What should inspection evidence include?
Depending on the agreement, it may include identification, photographs, video, check sheets, readings and a record of resolved exceptions.
Does inspection replace safe commissioning?
No. Receiving inspection, correct commissioning, operator training and local safety requirements remain separate responsibilities.
YOUR NEXT MOVE STARTS HERE
LET’S LIFT
YOUR AMBITION.
Tell us what you move. We’ll start with your requirements.
ZJ