01 / PROJECT ASSURANCE
From requirement.
To configured machine.
A useful factory conversation starts with the order specification. Model, mast, forks, tyres, power system, attachments and destination details should remain connected through preparation and release.

The pages use ZJ brand visualisations to explain a practical production workflow. They are not documentary proof of a named facility, production capacity or completed customer order.
01 / WORKFLOW
Six connected stages.
One defined handover.
Agree the relevant evidence, responsibility and acceptance point for the actual order.
Requirement review
Confirm application data, selected model, configuration, quantity, destination and the current technical scope.
Material preparation
Coordinate the frame, mast, hydraulic, electrical or power-system components required by the approved configuration.
Assembly sequence
Bring the selected systems together with controlled identification of the model, options and order-specific items.
Configuration check
Match mast, forks, tyres, battery or engine, controls and attachments against the approved order lines.
Function review
Agree the relevant travel, steering, braking, lifting, lowering and option checks before release.
Export preparation
Prepare loose items, protection, packing information and dispatch documents around the delivery plan.
02 / CONTROL POINTS
Make every handoff
easy to verify.
These control points keep the machine, documents and agreed service scope connected.
Order identity
Model, quantity and approved revision
Machine configuration
Mast, forks, tyres, power and options
Traceable checks
Inspection scope and recorded exceptions
Release package
Loose items, documents and shipping plan
03 / PROCESS IN CONTEXT



Illustrative ZJ brand scenes. They explain process stages and do not represent verified customer sites, named facilities or completed deliveries.
04 / PREPARE THE REQUEST
Send the right
project details.
A complete first message reduces assumptions and helps identify the correct technical or commercial next step.
Prepare this request- Required model or application brief
- Load, lift height and workplace
- Mast, fork and attachment needs
- Battery, charger or engine direction
- Destination and quantity
- Requested inspection or evidence
05 / PRACTICAL ANSWERS
Confirm before
you commit.
Can I confirm a custom forklift configuration?
Share the required mast, forks, tyres, power system, attachments and workplace details. Availability and final technical data must be confirmed for the selected model.
Does the website show a verified ZJ factory?
The page uses clearly labelled ZJ brand visualisations to explain the workflow. It does not claim that every image is documentary photography of a specific facility.
What production evidence can I request?
State the photographs, video, identification, function checks or third-party inspection required so the available scope can be confirmed before order.
When is a machine ready for release?
Release should follow the agreed configuration, inspection, document and packing checks defined for the order.
YOUR NEXT MOVE STARTS HERE
LET’S LIFT
YOUR AMBITION.
Tell us what you move. We’ll start with your requirements.
ZJ