09 / PROCUREMENT GUIDE

Verify the order.
Before it moves.

A pre-delivery review should connect the physical machine to the approved quotation. Model, configuration, identification, functions, loose items and documents all need a clear check.

01 / DECISION POINTS

Four details.
One connected choice.

Review these points together before comparing models or accepting a configuration.

01

Identity and configuration

Match model, serial or identification details, mast, forks, tyres, battery or engine and ordered attachments.

02

Visible condition

Review paint, structure, mast, chains, hoses, wheels, connectors, guards and shipping preparation for visible issues.

03

Function checks

Agree which travel, steering, braking, lifting, lowering, controls, lights and attachment functions will be demonstrated.

04

Documents and loose items

Count keys, charger, cables, tools, spares, manuals, labels and listed certificates or documents where applicable.

02 / BUYER METHOD

Turn the requirement
into evidence.

A structured brief reduces assumptions and makes technical and commercial comparisons easier to verify.

  1. 01

    Build from the order

    Turn every approved configuration line into an inspection item.

  2. 02

    Request evidence

    Agree on photographs, video, check sheets, readings or a third-party inspection where required.

  3. 03

    Record exceptions

    Describe any issue, responsibility, corrective action and acceptance status in writing.

  4. 04

    Control release

    Confirm that agreed inspection items and dispatch documents are complete before shipment release.

03 / SEND WITH YOUR ENQUIRY

Six inputs
for a clearer answer.

Measurements, photos or drawings are useful where the load or route cannot be described precisely in words.

Prepare this enquiry
  1. Final quotation or order specification
  2. Models and quantities
  3. Required inspection scope
  4. Photo or video requirements
  5. Third-party inspection details
  6. Document and accessory list

04 / PRACTICAL ANSWERS

Questions buyers
should ask early.

Is a generic inspection checklist enough?

No. It should include the exact ordered mast, forks, tyres, battery or engine, attachments, options, documents and loose items.

Can inspection be done by photos or video?

Evidence can support a review, but the appropriate method depends on the order and risk. Agree the scope before inspection.

What happens if an item does not match?

Record the difference, required action, responsibility and acceptance decision before shipment release.

Should packing be part of inspection?

Yes. Where required, inspect protection, loose-item identification, blocking, securing and package marking before dispatch.

YOUR NEXT MOVE STARTS HERE

LET’S LIFT
YOUR AMBITION.

Tell us what you move. We’ll start with your requirements.

Talk to
ZJ
FOR YOUR BUSINESS. FOR YOUR NEXT MOVE.WHATSAPP +86 181 0331 8125
WhatsApp