02 / APPLICATION SOLUTION EXAMPLE
Control the transitions.
Protect the routine.
Freezer and chilled routes combine temperature, condensation, traction, battery performance and operator exposure. The complete operating cycle must be reviewed.

01 / FIRST REVIEW
Six facts
before model selection.
The application title narrows the direction. The measured load, route, duty and destination determine what still needs to be confirmed.
- 01
Minimum and normal temperatures
- 02
Time in each temperature zone
- 03
Transitions and condensation routine
- 04
Load, lift height and aisle width
- 05
Battery, charger and recovery location
- 06
Tyres, protection and inspection routine
02 / STARTING MODEL
ZJ E20
as a comparison direction.
This is a starting point based on the catalogue category. It is not a suitability approval for the application.

ZJ E20
- Rated capacity
- 2 t
- Power
- Electric
- Lift range
- 3000 mm
03 / CONFIRM IN THE QUOTATION
Define the supplied scope.
Ask the quotation to identify the exact model, capacity basis, mast, forks, tyres, attachment, power package, destination configuration, documents, packing and delivery terms.
Final capacity, compatibility, availability and supplied configuration require order-specific confirmation.
YOUR NEXT MOVE STARTS HERE
LET’S LIFT
YOUR AMBITION.
Tell us what you move. We’ll start with your requirements.
ZJ